WIND + SOLAR60 MW15 MW50 MWAI COMPUTE30 MW · CONSTANTFLEXIBLE LAYER10 MW · RUNNING0 MW · STEPPED BACK10 MW · RUNNING

A DAY AT A DAME SITEWhat runs, what pauses, what the grid gets back.

ILLUSTRATIVE, SITE

AI compute, built where the power is.

DAME builds data centres beside wind and solar farms, and on industrial grid connections that already exist. Not where people live.

Ask about capacity Why this matters
Wind farm seen from above through cloud

Where we build

Australia switches off clean energy every day.

7.2TWh

of wind and solar switched off in the NEM in 2025, about an eighth of what the farms could have made.1

98%

rise on the same quarter last year in wind and solar forced off by network limits. The farms are built and connected. The lines are full.2

10GW

of batteries now installed in the NEM, holding about two hours each on average. Network curtailment still rose.3

It cannot all be stored. The answer is to use the energy where it is made. That is where DAME builds.

1 WattClarity, Generator Statistical Digest 2025: 7.2 TWh curtailed of 57.7 TWh available, NEM semi-scheduled wind and solar, of which 1.5 TWh was network curtailment. 2 AEMO, Quarterly Energy Dynamics Q3 2026: network curtailment of wind and grid-scale solar averaged 281 MW, up 139 MW on Q3 2025. 3 AEMO, Quarterly Energy Dynamics Q3 2026: installed battery capacity, including units still commissioning, exceeded 10 GW / 23 GWh; average duration calculated by DAME. Updated quarterly.

What we build

A data centre that arrives on trucks and leaves the same way, sharing its heat with local industry.

DAME · ILLUSTRATIVE84 SEC

Why this matters

Firm for AI. Flexible for the grid.

DAME sites beside a solar farm01

Using what is already built

No new transmission lines.

We connect behind existing generators and onto industrial connections with spare capacity. More energy moving through assets already paid for spreads their cost across more users.

Engineer at a DAME dry cooler02

Built to be removed

Modular on the way in and out.

Installed while the site is prepared, lifted out at end of life. Every site is built to a Tier III reference design, with N+1 power and cooling, and certified as it is commissioned.

Transmission tower at dusk03

Partners with the grid

Built and run by energy people.

When the grid is tight, our flexible layer steps back within seconds. AI compute sits outside that layer and keeps running.

Closed cooling loop pipework04

Liquid cooled

The most efficient way to cool AI.

AI chips run too hot for air. We cool them with liquid, direct to the chip or by immersion. The same liquid circulates in a closed loop, carrying heat away and coming back to cool the chips again.

What is running today

Operating in Tasmania. Scaling across the NEM.

  • 2021First proof of conceptLiquid-cooled, flexible compute from the first rig.
  • 2Sites in TasmaniaOne co-located with a solar generator, one our R&D centre at George Town.
  • 2025Market CustomerRegistered with AEMO. We buy our own energy and manage our exposure in the wholesale market, without a retail margin.
  • ~900MW pipelineSites in development in South Australia, Victoria and Queensland.
More about DAME

Who we work with

Built for AI customers, generators, regional communities and the grid.

Need capacity for AI compute? Talk to us.

Tell us the platform, the megawatts and when you need them.